2014-07-10

First oil change

I kind of forgot to take more pictures since the last ones. There wouldn't be anything too special anyway.

I took my forks to the dealer for service since I haven't yet tried to do it myself, but considering the price, 200e, I think I'll try to do it myself next time. Looks like the work itself covers about 2/3 of the price and doesn't look like black magic so it would be worth the effort. I think I already have a pretty good idea where to pay attention and what's needed for the service.

The bike also got a new set of tyres, Metzeler Roadtech Z8s since the old ones wouldn't have lasted for the whole season (assuming the bike works for that long :)) and those had been just standing still for two years. Didn't notice myself but the guy at the shop told that the wheel bearings made a little bit noise when balancing so I replaced the wheel bearings along with the sprocket carrier ones. Finally put a new chain and sprockets and it was ready to run.

Funny how you start hearing completely new noises after completing this kind of project for the first time. I think most of it is that I didn't previously pay attention to. It seems to run pretty well and at least on the engine side, the bearing noise is totally absent. Clutch plates are new with the old basket so it doesn't make too much noise. I don't really hear anything extra when the bike is standing still and accelerating. When riding, there's probably some intake noise at higher speeds, so need to check the intake manifolds that they are tight. Or it could be completely normal, wouldn't worry too much.

So 1000 kilometers behind so far and I decided it's time for the first oil change. There was some debris on the oil plug which I was expecting too since there are gears that may be in a little bit different position, piston rings repositioned etc.


That's something magnetic and even though the picture doesn't clearly show, it's kind of shiny stuff. The amount isn't huge so probably nothing to worry about. The oil filter screen had just some flange sealant bits on it. Not too much though. I still plan to pull both side covers off and check that flywheel and primary drive gears are still intact.

2014-05-11

Alive, ALIVE!






The frame attached to the engine. I used two mates to attach it: lifting with two and the third one put the mounting bolts in. I also took the front fork for oil change and cleaning while it was easy to take off. Luckily I had quite a few photos since I almost struggled with cable/hose routings but got that all settled finally. Nothing too special to write about since it's mostly working with things I do on every ordinary maintenance.






Then I had to make some room to put the oil cooler, horns and the center stand on so I put the front wheel on and used a rear lifter.





And here it is, getting ready for the first start. The center stand bolts are still somewhere very safe since I couldn't find them. I wasn't as organized with those as with other parts that were all on labeled zip bags. Maybe they were in too bad condition and I threw those away? Well, I'll get new ones and borrowed the ones from the side stand this time, since they are the same size. I put the bike on the center stand for the first start since somehow it feels safer than the rear lifter. So here is the video:


2014-05-09

Almost a motorcycle

It's getting closer. I continued by lifting the frame away from the lift table so I get some room for the engine. There were two nuts left to tighten: The primary gear nut and flywheel nut. Both require significant amount of force so I didn't even try to do that when the engine was on the table.



 The primary gear nut is 190Nm and the flywheel nut is 270Nm. My biggest torque wrench can go only up to 210Nm and even though the book says the tolerance should be only 5% while generally they are 10%, it really shouldn't matter that much or at least that's what I heard from quite experienced technicians. I started by assembling the flywheel and tighten it just a bit so I can attacht the flywheel holder tool I bought earlier. I was told that I could just use impact gun to tighten the nut so there wouldn't be need for a tool, but I didn't feel very confident about that so I decided to get the tool. It's not the original type that attaches to the case with two bolts but instead it has a long handle so it requires two to hold it and tighten the nut which wasn't a problem since I share the garage with my friend. Holding the flywheel it was fairly easy to tighten the primary gear nut to 190Nm and bend the washer to lock it. On the flywheel side I just tightened the nut to wrench's maximum 210Nm and used an impact gun to tighten it about 10 degrees more. I think it's fine.


Once the covers were closed by applying sealant on the surfaces I attached the swingarm to the case and it was ready for the frame to be lifted on it.

Pistons, cylinders and heads


It was time to make the pistons shine since they were pretty dirty. Nothing was seriously burned so it was quite a bit easier than with the valves. Just some WD-40 and wiping. I figured it would be whole lot easier to fit the pistons in the cylinders first as opposed to attach them to conrods first even though those circlips tend to be a bit tricky sometimes to get in specially when theres not too much room. And that's the method the Workshop manual suggested as well. I had new seals and circlips but didn't see it necesary to replace the piston rings since they looked good and there was only 40k km on the bike. So a nice cleanup for pistons and the cylinder, a thin film of oil to cylinder pipes and with a help of piston ring compressors the piston slipped in to the cylinder.







The cylinder pipe gasket requires some flange sealant on both sides of it and I used the Loctite's product that was mentioned in the book and it was available in the local store. It was pink color so of course I had to choose the rags covering the intake holes accordingly! Then I inserted the cylinders, locked the pistons to conrods, inserted a new head gasket, the head and head nuts.













There are three torques for the head nuts: 15Nm, 30Nm and finally 48Nm. I had the self made tool and a digital torque wrench I invested on. I think the tool was worth spending some money since you can't break it by forgetting to untighten the spring and if we go by the book, you should loosen and retighten it between every nut. This one doesn't require any of it and it also shows the current torque, so it was quite convenient to tighten the bolts evenly (and of course working diagonally). The nuts and stud threads were greased before tightening as the book suggested and without greasing they would be looser due to friction.



Once the heads were tight it was time to assemble the oil pump and the timing belts. Oil pump should be filled with oil to avoid air lock in which case the oil wouldn't flow when the engine is started. Also I had all new o-rings for the pump. Horizontal cylinder to TDC by looking at the marks on the other side of the engine (timing gear and the gear on the crankshaft under the flywheel) and the mark on the pulley on the RH side. Then align the camshaft pulleys to their reference marks and put the belts on. I used my mobile phone guitar tuner app to tighten the belts to 110Hz.


Gearshift lever alignment

Before assembling the cylinders and heads I took some time to make sure the gears engage correctly. For that the gear shift lever/fork needs to be in place. Ducati Workshop Manual mentions a special tool for the alignment and of course I didn't have one. But I don't see why it would be necessary since the only thing it does is 1) lock the gear selector drum in place and 2) shows the mid line of two drum rollers. The gearbox should be on second gear when it's aligned so if I had been wise enough and figured it out before closing the cases I would have marked the mid line of those two drum rollers with a marker. In fact this could have been done on the factory so the tool wouldn't be needed. When the bike is on the second gear, the drum won't move by itself. And all you need to do is to align the mid line of the two drum rollers and the line on the gear shift lever fork. The goal is to obtain approximately the same amount of movement to both upshift and downshift and then tighten the bolts. It's hard to get accurate feeling without using the actual shifter with your foot, but luckily this is fairly simple to adjust afterwards if needed. Of course the oil needs to be drained and LH side cover taken off..


2014-04-12

Case closed!

Once the heads were done, I got the new 0,05mm smaller shim for the crank so it was time to prepare to close the cases. I had photos of the opening ceremony which showed pretty well how everything was in their places. All the books that I have mention to start the reassembly by building the LH side case. I tried to think a reason why since most of the case joining bolts are on the other side so one would need to close the case and flip it over and then tighten the bolts. If I had a rotating engine mount it wouldn't be a big deal but on a table it's quite hard to rotate so I was rebel and installed the parts on the RH side case. There's one rubber O-ring inside which has a seating hole on the LH side case so that would be the only possible challenge as you want it to seat properly. Just a very small amount of grease was enough to glue it to the hole and it didn't drop off while I put the LH side case on.

Here it is waiting for sealant and closing. It's important to run through all the gears to check every gear engages. It will not happen very smoothly because there's a lot of play withou the other half of the case. Then a careful cleanup of the surfaces and we are ready to go. I used Ducati branded ThreeBond since it was available in the shop I ordered the replacement parts from and wasn't realy very expensive. I suppose you can get some cheaper permatex stuff and I heard the Permatex black would be great but since I really don't have any personal experience, I just went with Ducati recommendation.


Applied quite thin but consistend layer of the sealant and closed the case. Then tightened the mounting bolts working diagonally starting from inside M8 bolts. There are two torques for the book marked as 1st torque and 2nd torque. Not completely sure how this should be understood because I can think of two possibilities: 1) to torque everything to the first torque and then to second or 2) torque everything to the first torque, let the sealant to dry and then torque to second. Well, I followed the first thought and I suppose time will tell whether the oil stays in or comes out. The sealant mostly fills the gaps of the surface so I suppose if it was crucial, at least one of the books had mentioned about it. I let the sealant dry for a day before continuing with the reassembly.

Cleaning and lapping

There was quite a thick layer of carbon on the valve faces which was very hard to clean up without removing the valves. I also realized it's probably best to reseat them too so I removed them once again.



















On the left there's the one that I cleaned valves in place and how they looked like before. The intake valves got pretty shiny but the exhaust valves still are a bit dark. The surface is smooth and all the carbon is removed but didn't manage to polish those as well as the ones in the other head. So I removed them from the heads, attached to a drill with a piece of plastic tube to protect the valve and run them against a scotch brite pad lubricated with WD-40. On the right side you can see the results: Both intake and exhaust valves are bright and shiny but it didn't come easy, specially for exhaust valves. I probably spent half an hour for exhaust valves to get the carbon off while intakes started to shine in half of that time. Well, they are clean now even though the same treatment didn't make exhausts very bright on the other head. They are clean and carbonless still.


For reseating I used fine valve grinding paste and a manual tool. The contact surfaces had some carbon dots on those but they disappeared in the process. I ran a brief leakage test by pouring some alcohol on the head and visually inspecting the intake and exhaust channels and saw only one very small leakage on vertical exhaust valve. I think it took 10 minutes to show up but since the valves were still unattached to the rocker arms it was easy to just reseat once again. I ended up using coarse grinding paste this time first and then some fine again and I think I got it seated so the leak was finally gone.

2014-04-04

Valve adjustments

One picture tells more than a thousand words, right? So here we go:


That's my notes of measuring, adjusting and measuring and probably not very useful for anyone else than me. So I made a sheet that's divided on horizontal intake, horizontal exhaust, vertical intake, vertical exhaust and those are divided in chain side (left) and belt side (right) and again divided in closer and opener. There are ready made templates all around on the internet but I used my own which took only couple minutes to draw with google docs.

The valves weren't way off, depending which spec you follow. Vertical intake left closer was .008 inch and that was the biggest clearance there was. I still did some fine tuning and even ended up changing couple bits but that's all. I decided I'll follow LT Snyder's specs and not to worry too much for less than .001 differences except when the gap is smaller than LT or Ducati spec. More experienced guys always tell they used to fine tune by sanding shims down to get exactly when they were young but stopped worrying too much when they gained some experience. So I guess the settings I got as a result are decent:


Horizontal intakeHorizontal intakeHorizontal exhaustHorizontal exhaust
Left opener
.0055
(no adjustment)
Right opener
.004
(tight, sanded down a bit)
Left opener
.007
(a bit tight, no adjustment)
Right opener
.007
(was .004, changed shim)
Left closer
.004
(was ~ .0025)
Right closer
.0045
(was .003)
Left closer
.004
(bit tight, but was .003)
Right closer
.004
(was .003)

Vertical intakeVertical intakeVertical exhaustVertical exhaust
Left opener
.0045
(no adjustment)
Right opener
.004
(sanded down, was .0035)
Left opener
.0065
(no adjustment)
Right opener
.006
(was .0055, sanded down)
Left closer
.005
(was .008, changed shim)
Right closer
.005
(no adjustment)
Left closer
.0045
(bit loose, no adjustment)
Right closer
.004
(no adjustment)
LT's specs are bit tighter at some places and in some places they fit in Ducati's spec. LT says:

Intake opener: .004
Intake closer: .004

Exhaust opener: .006
Exhaust closer: .004

The Ducati spec in the LT's book isn't the same as in my Workshop manuals so I didn't write down those here, but the basic idea is that too small clearance is as bad as too big. There has to be clearance or the surfaces won't get lubricated. I would guess that big clearance on intake opener side could cause backfire but generally it's probably to avoid hammering the shim/valve with rocker arm.

The job is quite easy when you have the heads on the table. However pressing the rocker arm to get loaded gap is tricky with traditional way (pushing with screwdriver or small socket) so I took couple old screwdrivers and bent them so I was able to close the closer gap from between the back side of the rocker arm and the clinder head:






Those MotionPro tappet feeler gauges are really must have as it's so much easier to measure than with traditional ones. There are couple sizes missing. I'd like to have .007, .010 and perhaps .011 or so. Of course one could use .008 and .002 together and so on since I have two sets, but it's a bit tricky to get accurate measurement that way.

Once I got the inspection covers cleaned and all the bolts tightened, I realized it would have been handy to clean the valves while they are unlocked. Of course I realized it afterwards so I guess I have to remove every valve once again. Well, still don't have the shim for the crank so I nothing else to do meanwhile :)

Not dead yet, crank shimming measurement

The project has been on hibernate since it looked like I won't be able to make it on the last season. I've been doing other stuff on the winter so this one had to wait but now the sun starts to shine again, but luckily it's not too warm yet so maybe I won't get too late start for the season. I have other bikes too but I really really would like to start it with this one.

So continuing from where I left on the fall. I had new bearings in the cases and I needed to determine the required shimms for the crankshaft to obtain the desired preload. The shims were 2,25 mm on the chain(LH) side and 2,15 mm on the clutch(RH) side. But the mains went bad so it made me wonder what's wrong. I actually measured the end float on the fall and came in to conclusion that the preload was actually correct. But I still decided to take a second look now as I'm continuing the project. Found out something new I hadn't noticed before: crankshaft's oilway plug was loose and its thread prevents crankshaft's shimm to align nicely. It actually causes inequal load to the bearing so this could actually be the reason why the main bearing looked like it did. Here is a picture:



I went through my older photos and noticed it's loose in there too. I swear I didn't untighten it and the photos confirm that. The plug even had some scratch marks on it. The shim itself was just polished compared to the one on the other side. Anyway the plug should have thread locker and it should be tightened to fully home. It didn't seem to have anything extra in the thread. It's tight now and thread locked so probably not an issue anymore.

Next the actual measurement. There are two methods in the Workshop manual: the first one is to measure the depth of both cases and the thickness of the crank from web to web and add the preload. I had my doubts because while this should be perfectly good method to measure it requires more precise tools that are on my disposal. So I decided to try out what kind of numbers I'll get using a level and a digital caliper:






The crank isn't any issue since it gives quite consistent readings. The case is a different story. The level is pretty much the best straight item I have but doesn't seem to be good enough. The idea is to measure the distance between the contact surface on the case and the bearing. The readings I got varied for about 0,15mm to 0,20mm so that's way too inaccurate. I didn't even threw out the notes of the measurements but at least I know I can't do it this way. There's one thing this method revealed though: LH side is a little bit wider than the RH side. That may be the reason why the original shims aren't equal size.

The easier way is to get thinnest shims there is and put the crankshaft in and close the cases and tightened the screws to specified torque. So I got a pair of 1,90 mm ones (damn 25€ each) and measured the end float with dial gauge:


Even with this setup the numbers aren't obvious to me. They probably are for someone who has more experience but there's always the first time. So I had the dial gauge at the end of the crankshaft. Then I rotated the crank for a few rounds and the dial still pointed zero, so all good. The book says to use a screwdriver to level the crank up but I found the readings to have more variation that way so I just grabbed the crank with hands from the top and pushed from the botton, and got pretty much only 0,01 mm differences. I came in to conclusion the end float with 1,90 mm shims is 0,25 mm.

I have two versions of Workshop manuals: 2001 and 2002. The newer one suggests a preload of 0,30 mm and the older one 0,15 mm ± 0,20 mm. I think I'm gonna trust a bit more to the newer one of 0,30 mm. It also fits to the older specification which goes up to 0,35 mm preload. So my case:

1,90 mm + 1,90 mm + 0,30 mm (preload) + 0,25 mm (measured end float) = 4,35mm

So I need 4,35 mm of total shimming. What I had was 2,25 mm + 2,15 mm = 4,40 mm. This means a preload of 0,35 mm which may or may not be a bit too tight. It's in older spec but I kind of would like to avoid the limits of the range so I ended up ordering one 2,20mm shim for the LH side. While I wait for the shim to arrive, I can do the valves.

2013-08-22

New bearings installed

Was time to put the new bearings in to freezer and crank case halves to owen. The bearings spent abot a day in the freezer and the crank case halves were cooked for about an hour at 150 degrees in the owen. The workshop manual suggested 100C for removing the bearings but I thought the warmer the case is, the easier it is to get the bearings in. Besides there wasn't anything that could be damaged with that heat.

Main bearings and lay shaft bearings were the easiest as the bearing being at -18C and crank case half being at 150C the bearing went in without any interference. As a matter fact there was even a small clearance for a few seconds which disappeared rather quickly and the bearing didn't come off anymore. At least those should be straight as they literally hit the bottom.

Gearbox main shaft and timing shaft bearings were much harder and I actually had to tap the outer ring with a socket to get them in. They were also in the freezer but they are so small that the case heats them up so quickly. Tapping still requires probably much less force than just having both in room temperature.

Swingarm bearings and seals are still on the table. Those also seemed to be pretty tight but heat gun and cold spray should do. After that I get to real business measuring the crank shaft end float and required shimms. First I need to find the smallest ones since I'm a bit afraid I don't get any float with the original onces.

Bearings off

The last time I got the crankshaft removed so what was left, was removing the bearings and stud bolts. I would have left the stud bolts in place if my owen was big enough but unfortunately it isn't. Anyway it turned out to be a good choise since when heating the crank half in the owen the bearings came out almost by themselves. Much more convenient than with heat gun which takes ages to heat up.

Once I got the bearings removed I took the halves to a local machinery shop for washing. A quick way to get them clean even though the result could have been better. I think the only way to make it look like a new would be to boil them in sodium hydroxide. I didn't have facilities for doing that though and besides would rather practise with something cheaper since sodium hydroxide corrodes aluminium and therefor there's a possibility to ruin the cases. Well, they now look much better than earlier.

Currently there's no Ducati's importer in Finland as the previous one got fired or quit after 20 years, don't know the details, but it makes getting parts locally a bit hard. I would have liked to know the price at least even though I probably had ended up ordering the parts from Germany or Italy since they usually are pretty expensive here. I decided to change all the bearings except for heads and water pump, all the gaskets, seals and o-rings and belts. The total price was a bit over 700 euros including postage fees etc. Just the mains would have been ~150 euros total but wasn't up for saving here since the engine was already in pieces. Even though the price might sound high, if you take your Ducati for 20k km service (belts, valves, etc) the price is somewhere above 1000 euros in here. So yeah, you get most of the downstairs renewed cheaper. Own spare time is free of course :)


2013-08-12

Removing the crankshaft

It's been a while since the last update since there wasn't too much progress before I got removing of the primary drive gear removed which I couldn't do myself. Well, now pretty much everything is apart.

gearbox main shaft
gearbox lay shaft and selector drum

The gearbox comes out in a few different pieces. Started by removing the fork guide shafts and once they are off the fork drum comes off. When it's off, there's enough room to pull out the forks and finally the main shaft and the lay shaft can be taken out in one piece. At least for now I didn't separate the gears since the bike didn't have much mileage on it and the gears show no worn. Still need to make sure they are well cleaned and oiled before reassembly.

Gearbox removed
Primary drive grear removed
As I mentioned, I don't have the tool to remove the primary drive gear which I've heard, pretty much requires the OEM tool for the job since it's pretty damn tight. There were ones on eBay for about 140£ which is about 160€. I wouldn't have been in a bankruptcy because of that but for a one time job didn't sound like it's worth it. Besides my usual part supplier guy mentioned about his friend who has the tool and is willing to help so I paid a visit and it was really worth the drive even though he doesn't live exactly the next door. He has been working with Ducati engines since eighties, been racing with Ducatis and at some point even servicing the bikes as a sub-contractor for the local shop. He really was very helpful and got tons of invaluable tips for the rebuild so I ended up spending couple hours there even though the job itself didn't take even half an hour.

Obviously the gear didn't get off just by talking. Turned the puller with impact gun for a while and nothing happened. This wasn't even my cheap one but his professional tool. So applied some good heat with electrical heat gun and tried again. Still took a while, but finally popped off, yay.

I still had the timing belt drive shaft in place as my self made tool didn't work too well and didn't have time to fine tune it yet. Well, got the belt gears off on the same trip. Finally asked some opinions about the crank preload and he suggested using a dial gauge and thinnest possible shims to measure the crank play and then calculate the correct shims. That's the alternative method described in the workshop manual. Measuring crank and the cases is quite tricky according to him but I still think I try that just out of curiosity and see how close readings I get. I think I still count on the "alternative" method if the readings aren't too close.


Worth mentioning that the timing belt drive shaft has one symmetric woodruff key and one offset one so I took a picture of it to remember that on reassembly. So the timing on horizontal cylinder doesn't seem to be exactly the same as the vertical. The difference isn't really big but I suppose the key has offset for a purpose.

2013-07-27

Cases split

Today I started with removing the right side cover. Wasn't really hard to remove - just unscrew the bolts and that's it. The sealant didn't hold the cover too tight but it took a while though. Would have been hander if I had removed it while the engine was in the frame as there's the primary drive gear nut underneath the cover and it's pretty tight and now I didn't have anything to hold the gear against. But again, the cheap pneumatic impact gun saved the day and the nut was easy to remove after all.


RH side engine cover
Under the RH side cover
Primary drive gear nut off
I took the pistons off before undoing the nut to avoid damaging them if the gear slips out from hand for some reason. Lost one piston locking ring though but maybe I'll find it later, or then just get a new one.

Alternator cover puller helps splitting the cases
Cases split!

The factory manual suggested using the alternator cover and it's puller for splitting the cases so I put two blocks of wood under the engine and turned it sideways and tried what happens when turning the puller's bolt, after unscrewing all the engine retaining bolts from both sides of course. There didn't seem to be anything holding the cases too tight together so turning the bolt slowly and a few pretty gentle taps with a rubber hammer to gearbox transmission shaft did the job.

Inner race of the LH side main bearing. Doesn't look healthy.

I thought before I wouldn't find anything interesting on the flywheel side since the original noise sounded like it was coming from the right side of the engine. Though it's hard to tell for sure and the source of the sound waves perhaps can't be located accurately just by listening. I'm sort of happy of what I found since it indicates that there's definately something wrong with the bearings. The inner race seems to be toasted but only about half of the race. Also the same half of the inner side of the ring looks like polished but couldn't get a clear picture of it with my cellphone camera and I don't have anything better for the photos. Would this be an indication of too tight crank? If it is, the bearing on the RH side should probably look pretty much the same. Going to find out soonish but first I need to get the primary drive gear off.

I still have the timing belt pulleys on since didn't find suitable tool for the job so need to figure something out for it. For the primary drive gear I know a guy who has the puller, just need to pay a visit there.

2013-07-25

Heads off

Finally on a holiday! Even though most of the spare time was booked before I started the poject, managed to give the baby a little attention.

Gears from the left side removed

Timing belt rollers, tensioners and protection plates removed
Gears on the left side were very co-operative coming out and didn't have any issues there. The starter motor tried to put some drama to the table however since the first bolt I tried to open snapped without any losening. Great. Luckily it was the only one so I got the starter motor off. I measured the depth of the threads on the starter motor and it seems that the depth plus the thickness of the engine pretty much equals the length of the bolt. So the snapped bolt is stuck to the bottom of the starter motor's hole. Sounds a bit scary since if the bolt is too long, it may not be possible to tighten the bolt enough. So I need to check if shorter ones are necessary.

Poor man's engine stand (packing foam) works well enough
Cylinder head
The piston was not taken off with the cylinder
Headnut tool


The head nuts were pretty damn tight. Looked like the baby wanted to keep her heads, but me and Mr. WD-40 disagreed. Still too tight to turn with open-ended wrench as it might break the nut or maybe I'm just a bit overly cautious, but the box-end side was too thick. Luckily my father had made a special tool for removing the heads for valve adjustments so that one came in handy. There's an OEM tool as well, but my father wasn't the kind of man who would buy one if you can make one by yourself even if it was a cheap one :)

The horizontal head came out easily and the cylinder stayed on it's place but the other head was so tight that the cylinder came out with the head and also managed to slip the piston out from the cylinder. No biggie, was asking for advice from the forums whether to take the pistons out or not and thought I'm gonna leave them inside. Well, now I just need to get piston ring compressors which are affordable.

Finally managed to separate the vertical head from the cylinder, but it was pretty damn tight. I cut the liquid gasket with a piece of a sharpened soft plastic but didn't help. There are small guide rings that apparently are there to prevent any vertical play between the cylinder and the head and one of them was stuck in both sides but finally the head side gave up and came out. Seemed to be a bit corroded so maybe the sealing wasn't as good as it could be last time the heads were off. I'm sure I at least try to be much more careful.





Next I'll continue with removing the right side cover. Hopefully today.

2013-07-14

The engine is on the table

The engine is finally on the table. I tried to keep as many things possible things in place to avoid figuring how to re route electircal connections etc on assembly.

Before unmounting I removed:
  1. seat
  2. fairings
  3. fuel tank
  4. air box
  5. throttle bodies
  6. side stand
  7. center stand
  8. exhaust
  9. rider foot pegs
  10. gear shift lever
  11. rear brake master cylinder
  12. clutch
  13. alternator cover and flywheel
All of those things were pretty easy. I had bought a alternator cover puller earlier from eBay. A simple billet alloy one having three holes on it. It was a cheap one but seemed to do it's job. I hadn't removed the alternator cover earlier so had to be a bit cautious as it required some force to pull it out. The liquid gasket holds the cover pretty tight but came out smoothly after all by just slowly turning the puller bolt and pulling the cover with bare hands.

The torgue on the flywheel nut (Generator rotor nut) seems to be 270 Nm in the Workshop manual, so some resistance was expected. I've read from other sources that it has a high torque and some permanent locktite on it, but that may depend on model as the workshop manual lists only engine oil and no locktite for it. Need to figure it out when putting it back to one piece. The removal was pretty easy however. I didn't have a tool to hold the flywheel so I used a pneumatic impact gun and held the flywheel in place just with the other hand. My compressor is a small one and the impact gun is a cheap basic one but didn't require anything fancier.





Workshop manual lists a special tool 88713.1515, engine/frame support. That's used to connect the swingarm to the frame when you remove the engine, but doesn't seem to be a mandatory one, depending how are you going to remove it. I decided not to take the rear shock off if possible so I welded similar tool out of some junk 19mm steel pipe (two of those supports) and it seemed to do it's job with a little help.



I strapped the tools as it seemed that the swigngarm wants to move forward because there isn't any kind of support on horizontal axis. This was enought to prevent it from moving.

To remove the engine I had two firends helping me out. I don't (yet) have anything on the ceiling I could use to lift the bike up so I just piled wooden plates under the engine to get the rear wheel up a bit. Then I hammered the swingarm axle out which didn't want to come easily. It required some serious force in the beginning but didn't get damaged or anything. Engine was free to go once the frame mount bolts were removed. We lifted the engine a bit and removed the wooden plates one by one to get the it lower. I didn't remove the heads or belt covers but there was enough room to take it out. Finally when the plates were removed I lifted the rear of the bike and a friend carried the engine to the table. I had no clue how much would the engine weight so was prepared to carry it with two of us. If I had some ceiling mounted lifter I think I could have removed the engine even alone using the same method. But doesn't hurt to spend some time with friends as well :)


So far it has been pretty easy. Can't really figure out the real hours and the blog posts so far are written on a same day because didn't know if I'm gonna write one or not. Next coming up the engine disassembly. Need to find some time to do that.